10. Majuro Cooperative School Solar Project

Project Overview

Majuro Cooperative School undertook an innovative Solar project in 2021 with 4 outcomes:

  1. Supply and installation of a 5.6kW Solar system to power 4x 18,000BTU Solar Hybrid Air Conditioner units for Classrooms at Pre-K, Kindergarten, Grade 1, and Grade 2.
  2. Supply and installation of a Solar Water Desalination unit with a capacity of 125L per day, sufficient for around 65 students per day.
  3. Supply and installation of a Solar water pumping solution to provide a reliable source of water for restrooms even in cases of power outages.
  4. Retrofitting classroom lighting to LED ceiling lights.

The photos below are of this project

5.6kW (350W x 16) Solar Array on the roof
Coop Board, UN rep, and GES ground breaking of project
One of the Solar Hybrid Air Conditioners
Solar water pump system
Solar water desalination system
Solar water desalination system
Classrooms before lighting retrofit
Classrooms after lighting retrofit